The Dubai Dry Docks was constructed in 1971 and is one of the leading ship repair yards in the world. The Company contacted Enviropeel because it was anxious to solve the problem of accelerated corrosion of pipes and flanges in chambers below ground level.
Check out our white paper to learn how Enviropeel helps eliminate corrosion caused by high humidity levels and atmospheric conditions.
Fill out your information in the form to access the white paper “Dubai Dry Docks.”
For industry tips and the keep up-to-date in the corrosion inhibiting technology space, subscribe to the Enviropeel Blog.
Yes, I would like to be notified by email when there are new case studies, white papers, articles, trainings, or videos.